Poster sale · Free shipping over $80 · Red tag edit

BTC Report 03 1897 Plate 21: Subway Stages of Work at Tremont Street, Boston, Massachusetts Step 1: Map Option:Small (8.5" x 11" Paper) Date: December 8

SKU 81385862145
4.0
USD14.95 USD40.95

Pay in 4 interest-free payments of $3.74 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 10 - Aug 15

Description

Date: December 8

Boston in Transit Book Figure 7

Contributor(s): Geo

Atlas: Long Island

ID: 2022041506

BTC Report 03 1897 Plate 21: Subway Stages of Work at Tremont Street, Boston, Massachusetts Step 1: Map Option:Small (8.5" x 11" Paper) Date: December 8Subject: Tremont Street Subway (Now MBTA Green Line) Publisher: Boston Transit Commission Type(s): Architectural Drawing, Print Size: 22" wide x 9" high ID: BIT16600 Collection: WardMaps LLC Atlas: Boston Transit Commission Annual Report 03 1897 Boston in Transit Book Figure 3. 23 Construction Sequence at Tremont Street, 1897 Four cross section drawings articulate the sequence of construction at Section 6 of the Tremont Street Subway under Tremont

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products